KIIC Jl. Harapan Raya Lot. KK-10 Karawang. Jawa Barat
mid-sales@miuraz.com
(021) 2936 9977

WITH THE PRESS OF A SINGLE BUTTON, MIURA BOILERS PRODUCE STEAM IN FIVE MINUTES OR LESS.

It takes only 4 to 5 minutes after ignition to start producing steam at a predetermined pressure, which allows quickly get to work on operations.

Miura boilers meet lower NOx standards, reduce maintenance and monitoring needs, and reduce space requirements. And they do it with the most real-world, in-service efficiency possible, saving you up to 20% on fuel costs.